Road pavement
Reinforcement laid and aligned along the route, before the pavement is poured.
Coordination on site
The conversation before the task: coordination, safety and sharing out the work.
Structure under construction
Reinforcement and formwork assembled along the route, ready for the pour.
Building frame
Columns and beams in reinforced concrete, with the formwork propped before the pour.
Columns and beams
Columns and beams assembled over the formwork, before the structure is poured.
Working at depth
Foundation reinforcement assembled in an excavation, with the team checking position and plumb.
The detail is part of the structure
Starter bars, links and cover checked before the formwork is closed.
Structural mesh in place
The reinforcement mesh assembled over the surface prepared to receive the concrete.
Hands that build
Reinforcement assembled on site, with attention to detail and to the design.
Footings and foundations
Reinforced footings, the starting point for the stability of the whole structure.
Vertical elements
Column reinforcement prepared for formwork, over the structure already built.
Precision in the fixing
Setting the plates and holding-down bolts that will carry the equipment, where tolerance is measured in millimetres.
Foundation blocks
Foundation blocks completed and aligned, ready to receive the equipment.
Formwork and foundations
Formwork and foundation preparation followed on site.
Access and circulation
An access pavement reinforced and edged with kerbs, before the pour.
Road under construction
Road pavement reinforced between kerbs, with the previous section already poured and ready to be carried on.
Hollow-block slab
Hollow blocks set between the beams, with the reinforcement prepared before the topping is poured.
Trench along the perimeter
A cable trench built alongside the fence, following the line of the compound.
Trench under construction
The trench and its formwork being built, with levels checked along the route.
Working in the excavation
The bottom of the excavation prepared and levelled before the reinforcement goes in.
A set of substation equipment
Equipment set on the foundations built for it, with the cable ducts still being prepared.
Substation equipment
Equipment installed on the foundations built for it, inside the fenced compound.
Equipment being installed
Equipment being installed over the foundation blocks and structures already completed.
The people who shape the work
A group record of the professionals who follow every work front.
These photographs are part of our company portfolio. To see work relevant to your own needs, get in touch. Sharing references and further information depends on availability and on the corresponding permissions.
Get to know GOTICA in detail.
The company, our services, site records and information for clients. 14 pages, in Portuguese.
LET US BUILD THE NEXT STEP